Public Account Public Account

Scroll loading

Location:
Homepage
/
/
/
Level division and principle of purification workshop

Level division and principle of purification workshop

  • Categories:Industry news
  • Author:
  • Origin:
  • Time of issue:2021-08-04
  • Views:0

(Summary description)When it comes to factory renovation, we always mention “shop cleansing”. But what exactly is purification? What are the construction specifications for clean engineering? Today, Aren explains this systematically. If you have plans for factory renovation, you may wish to refer to it!

Level division and principle of purification workshop

(Summary description)When it comes to factory renovation, we always mention “shop cleansing”. But what exactly is purification? What are the construction specifications for clean engineering? Today, Aren explains this systematically. If you have plans for factory renovation, you may wish to refer to it!

  • Categories:Industry news
  • Author:
  • Origin:
  • Time of issue:2021-08-04
  • Views:0
Information

When it comes to factory renovation, we always mention “shop cleansing”. But what exactly is purification? What are the construction specifications for clean engineering? Today, Aren explains this systematically. If you have plans for factory renovation, you may wish to refer to it!

1. What is the workshop purification project?

The workshop purification project mainly excludes particulates, harmful air, bacteria and other pollutants in the air within a certain space, and controls indoor temperature, cleanliness, indoor pressure, airflow velocity and airflow distribution, noise vibration and illumination, and static electricity. Within a certain range of requirements, to ensure that the product can be produced and manufactured in a stable environment.

Such a stable production environment that meets the requirements is called a clean room, also called a clean room, a clean room, and a clean room. No matter how the external conditions change, the interior can maintain the cleanliness, temperature, humidity and pressure that meet the original requirements.

2. Classification of the purification workshop:

Purification workshops can be of several grades depending on factors such as regional environment and degree of purification. In general, the smaller the value, the higher the level of purification. That is, 100 grades > thousand grades > 10,000 grades > 100,000 grades > 300,000 grades.

In the most common 100,000-level purification workshop, it refers to a clean workshop with an air cleanliness of 100,000.

3. Principle of purification workshop:

Generally, it is necessary to pass the primary filtration, the intermediate filtration, and the high filtration three filtration sections.

Air flow → initial effect purification → humidification section → heating section → table cooling section → medium efficiency purification → fan air supply → pipeline → high efficiency purification air outlet → blowing into the room → taking away particles such as dust bacteria → returning blinds → initial purification, repeat Such a series of processes can achieve the purpose of purification.

In addition, is it necessary for all factories to be cleaned? the answer is negative.

Whether it is necessary to do the purification project depends on the type of production in your factory; and what cleanliness and cleanliness is in your clean room, it is also suitable according to the requirements of the production process.

Scan the QR code to read on your phone

Related information

Contact us

Wujiang Jinxiao Air Conditioning Purification Co., Ltd.
Tel:
0512-63203021
Technical:0512-63205222
Engineering:0512-63209075
Email:liangzhenhua@wjjinxiao.com

Add:2888 Jinzhou Road, Jinjiaba, Lili Town, Wujiang District, Suzhou, Jiangsu, China

JINXIAO

Copyright ©Wujiang Jinxiao Air Conditioning Purification Co., Ltd. 2021 All Rights Reserved.